Case 1
Industrial water treatment plant at "Rosinka" brewery, Kiev, Ukraine.
| Flow rate 40 m3/h Number of tanks 4 pcs Control valve SIATA Bed volume 2 400 l Filter media ECOMIX® P Linear flow rate 20 mph Operation started 2003 NaCl consumption 120 g/l media Water consumption for regeneration 9,5 m3 Prime cost of 1 m3 of treated water USD 0,27 |
|